- Furnace tube water walls;
- Boiler internal tubes and elements
- Boiler piping
- Loose tubes and headers
- Boiler roofs
Mangung Super Critical Coal Fired Unit Pressure Part Arrangement/Detail Drawings (2012) Malaysia
Parametric 3D models and drawings - Pressure vessels, pressure parts and piping drawings
| Thermal power generation
Working in a partnership approach with Alstom Power Inc and using high performance tools developed by HyperShell Technologies IGEMS (International Global Engineering and Manufacturing System), we completed the entire Critical 1000 MW boiler pressure parts Arrangement/details drawings. Here are the main pressure parts components for which we completed the required drawings: